P-5632

Laga Mume Keku Water Project

Description

Financing

Documents

Photos

History Logs

Project Description

Country: Ethiopia

Location: Nekemte

Total Budget: $6,719

Area of Focus: Water, sanitation and hygiene

Activity Type: Water: Supply/Access

Summary: Upgrade gravity-fed potable water system for 2,062 people in Hara Keku Kebele, Ethiopia.


The Laga Mume Keku spring provides neither accessible nor adequate water to the community. The project will repair the spring cap, provide a water distribution point and a clothes wash station at the spring, and install 1.1 kilometers of water pipe to provide a four-faucet water distribution point closer to the main population center. Work will begin in November 2025 and will be completed by May 2026. Funds will be used for materials, masonry, concrete, pipeline installation, transportation, and professional technical oversight. Community members will provide construction labor. Members of the Rotary Club of Nekemte will provide a bank account, oversee the funds, and work with the community during construction.

Project Contact Person

District: 5440

Rotary Club of: Sheridan

Primary Contact: Susan Brayton

Email: brayton48@msn.com

Project Status

Approved
This project is "Approved". This means that the district leadership has reviewed and approved the allocation of district funds for this project. Once the funds from the district have been issued, the status of the project will be changed to "Paid".

Project listed for the 2025-26 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Sheridan (5440)

27-May-25

$2,244

$3,500

$5,744

Sheridan (5440)

8-Jul-25

$975

$0

$975

Total

$3,219

$3,500

$6,719

Project Supporting Documents


[27-May-25]
Budget


[30-May-25]
club questionnaire


[9-Jun-25]
club questionnaire part 2


[9-Jun-25]
MOU PE Signed


[6-Jun-25]
MOU President Signed


[9-Jun-25]
PE signed MOU


[27-May-25]
Proposal


[27-May-25]
Proposal Addendum

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

27-May-25

by Randy Looper

Susan,

Can you remind your current PE Cassandra that they still need to answer the club qualification questions found at this link: https://rotary5440.org/page/district-grant-qualifications

Once she sends her answers to me i can send her the MOU she and her PE needs to sign.

Randy Looper

District Grants

30-May-25

by Susan Brayton

System Entry: Project sent for club signatures.

30-May-25

by Susan Brayton

System Entry: Project signed by Susan Brayton.

1-Jul-25

by Randy Looper

Susan,

The District had $18,000 more grant requests than available DDF for the 25 - 26 grant year. In order to meet the available DDF it was determined that we need to reduce the 3 tier levels to the next lower tier or $1,000. I have cancelled your signature process and reduced your DDF request by $975. You will need to either reduce the total budget for your grant or increase your club giving by $975 so it balances. Once you have made this adjustment please start the signature process again.

If you have any questions please email or call me at 970-629-0654.

Randy

1-Jul-25

by Randy Looper

System Entry: Signature Process cancelled by user.

1-Jul-25

by Randy Looper

System Entry: Project reverted to "Published".

8-Jul-25

by Susan Brayton

System Entry: Pledge of $975 by Susan Brayton of the Rotary Club of Sheridan, District 5440.

8-Jul-25

by Susan Brayton

System Entry: Project is now "Fully Pledged".

9-Jul-25

by Susan Brayton

System Entry: Project sent for club signatures.

9-Jul-25

by Susan Brayton

System Entry: Project signed by Susan Brayton.

14-Jul-25

by Randy Looper

System Entry: Project approved by the District Approval Committee.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online