11-Jun-23 |
by Randy Looper |
System Entry: Creation of project page.
|
13-Jun-23 |
by Randy Looper |
System Entry: Project sent for club signatures.
|
13-Jun-23 |
by Randy Looper |
System Entry: Project signed by Randall J Looper.
|
3-Jul-23 |
by Randy Looper |
System Entry: Project approved by the District Approval Committee.
|
9-Aug-23 |
by Randy Looper |
System Entry: Check for DDF payment issued by Foundation Treasurer.
|
15-Jan-24 |
by Randy Looper |
The Little Libraries have been built and 8 of them have been installed. The final 5 libraries will be installed in the spring.
|
8-Jun-24 |
by Randy Looper |
13 of the 14 Little Libraries have been installed. Craig Rotarians are monitoring them and keeping them stocked with books.
|
19-Oct-24 |
by Randy Looper |
We have installed all 14 Little Libraries in Maybell, Craig & Hayden. We are still purchasing books to complete the grant.
|
5-Aug-25 |
by Randy Looper |
The project is complete and the final report will be completed by September.
|
13-Sep-25 |
by Randy Looper |
System Entry: Project has been implemented and final report uploaded.
|
13-Sep-25 |
by Randy Looper |
System Entry: Final report approved by the District Approval Committee.
|