G-1761

School Renovation Project

Description

Financing

Documents

Photos

History Logs

Project Description

Region: Asia

Country: India

Location: Dhamane near Pune

Total Budget: $41,520

Area of Focus: Basic education and literacy


School Renovation Project in Dhamane Village near PUNE

FOCUS AREA:

This is an ambitious Rotary project to transform a rural state government school in Dhamane village into a model happy & smart school by providing the proper conditions for school children to learn & experience a complete education. The Zilla Parishad (ZP) primary school is in Dhamane village, about 50 km north of Pune. This project covers the focus areas of Sanitation & Hygiene, Literacy & Health as per Global Grants requirements.

PROJECT NEED:

Currently the school has run down infrastructure, with broken building, toilets & water facilities which are woefully insufficient for the students & staff. The state government provides insufficient funds to the school, causing the school children to suffer. Attendance is irregular especially among girl students. Absenteeism is higher than normal due to poor sanitation & related health issues like diarrhea. The high dropout rates have been reducing the number of students every year. Hence students lack motivation to attend school & concentrate on their studies & extracurricular activities. This school currently has 107 students studying between Kindergarten to 8th Standard with 61 boys and 46 girls (April 2018).

PROJECT DETAILS:

The goal is to repair existing school buildings including classrooms to provide a comfortable & motivational environment for the school children to focus on their education. This includes repairing the walls, floors, doors, windows, floors & roofs. And provide proper electrical wiring, lights & fans. And provide furniture like school benches for the school children, tables & chairs for the staff, solar backup supply for the irregular electric supply, library facilities, computer laboratory with Rotary Distance Education Program (RDEP) for each class. The project will provide ample toilet & clean water facilities as needed. Besides, tree plantation & rain water harvesting to conserve water through the dry summer months will be considered along with improved facilities for sports & recreation. The key is to get the villagers, staff & school children involved in maintaining their school in good condition by direct involvement. The goal is to make this school a model for other nearby ZP schools to emulate.

PROJECT COSTS:

Building Repairs: Rs 18,00,000

Electricals: Rs 100,000

Furniture: Rs 500,000

Teachers Training: Rs 100,000

Sports Facilities: Rs 100,000

Contingencies: Rs 223,258

TOTAL: Rs 28,23,258 ($41,519 @ Rs 68 = $1.00 September 2018)

PROPOSED FINANCING:

Contributors Contribution TRF Matching

Host Clubs $ 6679 $ 3340

International Partner Clubs $ 7000 $ 3500

Host District 3131 (DDF) $ 3500 $ 3500

International District DDF $ 7000 $ 7000

Total $ 24179 $ 17340

Grand Total $ 41519 (Rs 28,23,258)

PROJECT BENEFITS:

The benefits of this project are multifold. First is the overall improvement in the school infrastructure to make it a model happy smart school for the others to emulate based on its success. Better school facilities will improve school enrollment & attendance, reduce dropout rates, spread healthy habits in the family & community, prevent diseases & diarrhea & improve academic performance. The teachers will also be trained to improve their pedagogical methods of teaching to take advantage of the better infrastructure and benefit the students. About 107 school children in this ZP school will benefit directly & indirectly 600 family members will be positively impacted. School enrolment is projected to increase as facilities and infrastructure improve. Projected life of this school project is 15-20 years.

SPECIAL NOTE:

1. Ongoing repairs & maintenance will be handled by the school authorities with funding from the state government & village council, for which a MOU will be signed with Rotary for this project. Other NGOs will also be invited to support this project on a regular basis.

2. The WASH in Schools facilities will be installed as part of this project.

3. Initial goal will be to improve the infrastructure in the school, with the final goal being to make this happy smart school to be self-supporting.

4. Sports City may seek other rural clubs as partners for this project with their contribution in funds & project planning, execution & follow up.

5. The village council, school authorities & community will be encouraged to be fully involved in maintaining & improving this school with the help of the children, with regular drives for cleaning, tree plantation, RWH, health & medical camps etc.

PRIMARY HOST CLUB:

Rotary Club of Pune Sports City & RID 3131, India

For further details:

Contact: Rtn Vinod Patil, 91 98223 96173 & patilvinod72@gmail.com OR

Rtn Sandesh Savant, 91 98220 91102 & sandeshsavant@rediffmail.com

Primary Host Partner

District: 3131

Rotary Club of: Pune Sports City

Primary Contact: Sandesh R. Savant

Email: sandeshsavant@rediffmail.com

Primary International Partner

District: 1100

Rotary Club of: Newent & District

Primary Contact: Brian Robbins

Email: brian@woodredding.co.uk

Project Status

Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.

Project listed for the 2018-19 Rotary Year.

The TRF Grant application number is #1862941.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Pune Sports City (3131)

10-Sep-18

$6,680

$3,500

$10,180

Newent & District (1100)

26-Apr-19

$7,000

$7,000

$14,000

Amount Requested from The Rotary Foundation

$6,840

$10,500

$17,340

Total

$41,520

Note: as of July 1, 2015 there is a 5% additional support fee for cash contributions. This fee does not appear in the financials above because it does not apply if the funds are sent directly to the project account (without going through TRF, and therefore without Paul Harris credit). Clubs sending their cash contribution to TRF must be aware they will have to send an additional 5%.

Project Supporting Documents


There are no documents yet for this project.
Go to the administration page to upload documents.

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

10-Sep-18

System Entry

System Entry: Creation of project page.

26-Apr-19

by Sandesh R. Savant

Project Funded & almost completed

26-Apr-19

by Sandesh R. Savant

System Entry: Project is now "Fully Pledged".

2-Sep-19

System Entry

System Entry: Fully Pledged project dropped per lack of response to the carry-over notification emails.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online