G-1584

Center for Functional Recovery

Description

Financing

Documents

Photos

History Logs

Project Description

Region: South America

Country: Brazil

Location: Santos / SP

Total Budget: $96,229

Area of Focus: Disease prevention and treatment


The project aims at the physiotherapeutic attendance of the population of the metropolitan region of Santos, which counts with nine municipalities and a population close to 1.8 million in habitants.

Specific objectives: The MCFR is a project that focuses on the prevention and treatment of diseases. It offers access to Physiotherapeutic treatment with the purchase of the most modern physiotherapy health equipment for the poor patients with:

• Hemophilia

• Cardiopulmonary diseases

• Chronic degenerative diseases

• Chronic spinal column problems

map of the region that will be served by the project

It is worth pointing out that, according to statistical data provided by the World Health Organization (WHO), it is estimated that in the Santos base, there are 200 individuals affected by hemophilia who do not have physiotherapeutic attendance in the region in the prevention of disease-related commodities.

Cardiovascular diseases are already considered the first cause of death in the world. About 17.5 million people die from cardiovascular disease each year, according to the World Health Organization (WHO).

In Brazil, Officials at the Ministry of Health point out that the cities of the Santos lowlands lead the death rankings for heart ischemia. Together, they have mortality rates of 94.8 cases for each 100,000 inhabitants, estimated to be a total of 1,700 individuals affected.

With the purchase of these equipment, the recovery time of patients will be much faster.

The Santos-Porto RC has budgeted this project at around US $ 95,755.

Primary Host Partner

District: 4420

Rotary Club of: Santos-Porto

Primary Contact: Ronaldo Varella

Email: ronaldovarella@supertrans.com.br

Primary International Partner

District: 5330

Rotary Club of:

Primary Contact: Chehab Ekawar

Email: shabdg201415@gmail.com

Project Status

Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.

Project listed for the 2018-19 Rotary Year.

The TRF Grant application number is #47877.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

District 4420 DDF

2-Jul-18

-

$33,514

$33,514

District 5330 DDF

14-Jul-18

-

$100

$100

Maringá-Colombo (4630)

13-Sep-18

$1

$0

$1

District 3231 DDF

15-Sep-18

-

$14,500

$14,500

Amount Requested from The Rotary Foundation

$0

$48,114

$48,114

Total

$96,229

Note: as of July 1, 2015 there is a 5% additional support fee for cash contributions. This fee does not appear in the financials above because it does not apply if the funds are sent directly to the project account (without going through TRF, and therefore without Paul Harris credit). Clubs sending their cash contribution to TRF must be aware they will have to send an additional 5%.

Project Supporting Documents


There are no documents yet for this project.
Go to the administration page to upload documents.

Project Photos

History Log Entries

2-Jul-18

by Ronaldo Varella

System Entry: Creation of project page.

14-Jul-18

by Chehab Ekawar

System Entry: Pledge of $100 DDF by Chehab Elawar of the Rotary Club of San Bernardino Sunset, District 5330.

13-Sep-18

System Entry

System Entry: Pledge of $1 by Mauro Duarte of the Rotary Club of Maringá-Colombo, District 4630.

13-Sep-18

System Entry

System Entry: Pledge of $1 by Mauro Duarte of the Rotary Club of Maringá-Colombo, District 4630.

13-Sep-18

System Entry

System Entry: Pledge of $1 by Mauro Duarte of the Rotary Club of Maringá-Colombo, District 4630.

13-Sep-18

by Mauro Carvalho Duarte Junior

System Entry: Pledge of $1 by 65533;Mauro Duarte of the Rotary Club of Maringá-Colombo, District 4630.

15-Sep-18

System Entry

System Entry: Pledge of $14,500 DDF by C. R. Chandra Bob of District 3231.

15-Sep-18

System Entry

System Entry: Project is now "Fully Pledged".

2-Jan-19

by Philippe Lamoise

System Entry: Project dropped by Philippe Lamoise.

Reason for dropping: Ronaldo Varella wrote that this project was implemented some other way.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online