The project aims to strengthen equitable access to water supply and improve hygiene and sanitation conditions in the communities of Barrio Marín in Patillas, Puerto Rico. In addition, to provide a water filtration system, the project seeks to improve the health of this community by providing filtered water and thus avoid dependence on the purchase of bottled water for consumption.
The project consists of the installation of two filtration systems that operate with solar and wind energy that will allow the community to have access to drinking water in two communal areas. The system will be installed by H2Opendoors, a foundation that specializes in the installation of these systems throughout the world. In addition to the installation of the systems, training will be offered to four people per filtration system, who will be in charge of the maintenance and conservation of the system.
El proyecto pretende fortalecer el acceso equitativo al suministro de agua y mejorar las condiciones de higiene y saneamiento de las comunidades del Barrio Marín en Patillas, Puerto Rico. Además, de proveer un sistema de filtración de agua, el proyecto busca mejorar la salud de esta comunidad al proveerles agua filtrada y así evitar la dependencia de la compra de agua embotellada para el consumo.
El proyecto consiste en la instalación de dos sistemas de filtración que operan con energía solar y eólica que permitirá a la comunidad tener acceso a área potable en dos áreas comunales. El sistema será instalado por H2Opendoors, una fundación que se especializa en la instalación de estos sistemas a través de todo el mundo.
Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.
Project listed for the 2019-20 Rotary Year.
The TRF Grant application number is #1870805.
Proposed Financing
Existing Contributions Towards This Project
Date
Cash
DDF
Total
District 7000 DDF
27-Mar-18
-
$2,500
$2,500
Arlington (Sunrise) (5790)
12-Jul-18
$2,500
$0
$2,500
Amount Requested from The Rotary Foundation (waived)
-
Additional Contribution (not matched by The Rotary Foundation)
$75,161
Total
$80,161
Note: as of July 1, 2015 there is a 5% additional support fee for cash contributions. This fee does not appear in the financials above because it does not apply if the funds are sent directly to the project account (without going through TRF, and therefore without Paul Harris credit). Clubs sending their cash contribution to TRF must be aware they will have to send an additional 5%.
Project Supporting Documents
There are no documents yet for this project. Go to the administration page to upload documents.
Project Photos
History Log Entries
27-Mar-18
System Entry
System Entry: Creation of project page.
27-Mar-18
by Jose Lucas Rodriguez
System Entry: Pledge of $2,500 DDF by Jose Lucas Rodriguez of the Rotary Club of Yauco, District 7000.
27-Mar-18
by Jose Lucas Rodriguez
System Entry: Pledge of $75,160 by Jose Lucas Rodriguez of the Rotary Club of Yauco, District 7000.
12-Jul-18
System Entry
System Entry: Pledge of $2,500 by Christopher McLucas of the Rotary Club of Arlington (Sunrise), District 5790.
12-Jul-18
System Entry
System Entry: Project is now "Fully Pledged".
3-Dec-18
by Edwin Figueroa
We have already received the coordination team for installation.
19-Mar-19
by Edwin Figueroa
On march 14, 2019, The installation of the first filter system was started,In the Marin neighborhood below, Patillas P.R. with the collaboration of the Sunspring company, members of "Los Buenos Somos Más" and the Rotary Club of Guayama P.R. The installation of the second system was cordinated for the next month of April, 2019.
We understand that our project is 60% complete.
25-Aug-19
by Edwin Figueroa
Adjunto varias fotos de la inaguración de la primera fase del proyecto, sistema de filtro Bo. Marín Bajo Patillas PR, se envio el cheque para el segundo sistema de filtro Bo. Marín Alto Patillas PR, se espera instalar entre el 16 @ 24 de Septiembre.
16-May-20
by Edwin Figueroa
El segundo informe parcial fue sometido desde el mes de marzo 2020,aun se espera aprobacion del mismo para proceder a someter el informe final, ya que se completo el proyecto.
Gracias
2-Sep-20
System Entry
System Entry: Fully Pledged project dropped per lack of response to the carry-over notification emails.