P-2976

Blue Mound Fitness Park

Description

Financing

Documents

Photos

History Logs

Project Description

Country: USA

Location: Nocona, Texas

Total Budget: $6,000

Areas of Focus: Disease prevention and treatment, Maternal and child health, Community economic development

Activity Type: Health: General

Summary: Initial phase construction of access and parking lot for a physical fitness trail and exercise stations benefitting the people in Nocona, TX and those residents nearby.


The Blue Mound Fitness Park is intended as a City of Nocona owned and maintained park dedicated to providing residents and non-residents of all ages, an outdoor facility to maintain their general health and well being by use of a walking-biking-running trail together with Fitness Station, a Gazebo shelter and benches for quiet reflection.

The Fitness Park will provide a fitness trail for the citizens of Nocona and surrounding area residents, with elevation changes for better cardio health and nature setting with views for mental well being.

Additionally, local groups such as the Relay for Life have expressed an interest in using the trail for future fund raising and health related events.

The Trail and Fitness Improvements Proposed; -TOTAL PROJECT

The Fitness trail is a non-motorized path, 6 ' wide and approximately 5300 feet long. winding around the site through the trees, climbing up and down the slopes. The Trail Entrance near the parking lot has an ADA compliant drinking fountain and shaded rest station. 6 park benches are located at points along the trail, each with trash containers. The gazebo is located at the highest point for views.

A 40' x40' fitness station is to be located along the trail. Within the station are separate pieces of exercise equipment appropriate for all ages.

A final phase of the project will provide for lighting of the trail, and parking lot.

THIS GRANT APPLICATION IS FOR PHASE 1

The Parking Lot and Entrances-PHASE 1:

The plan provides an entry to the Park from both Blue Mound Street and Grayson Street. Pipe Rail entry gates shown will enable the Park to be closed to vehicle traffic at night. 31 standard parking spaces and 2 handicap spaces are provided in Phase 1.

The parking lots are to be gravel base surface without curbs or concrete paving. This will enable construction of a firm surface initially to park vehicles, and provide a stable sub-surface to pave the lots in the future.

After completion of the parking construction, the path of the trail will be mowed enabling use of the earth trail initially. The initial phase will be completed in 2019-20 Rotary year.

Use of Grant Funds:

The initial grant application is for construction of the gravel parking lot, entry gates, and mowing the trail. This $6,000 project cost is possible with the City donating the equipment and labor for parking lot construction plus trail mowing and Rotary paying for the gravel material. The pipe rail fencing material is donated and the labor to install the fence will be done with community & student volunteers.

Progress to Date:

The 16+ acre site has been donated and deeded to the City of Nocona. Additionally, construction of the Gazebo at the top of the Blue Mount Hill has been completed


Addendum to Project Description (added after the project was signed)

The check from District 5790 for $3000 was deposited directly into the Blue Mound Fitness Park bank account. Blue Mound Fitness Park, a 501(C)3 was set up for the facilitation of the building of the park. The Rotary Club of Nocona matched the $3000 with a check to Blue Mound Fitness Park for a total budget of $6000 for the district grant. Transactions of the Blue Mound Fitness Park are included in the documents provided including cancelled checks, bank statements and invoices.

Project Contact Person

District: 5790

Rotary Club of: Nocona

Primary Contact: Robert Herndon

Email: rhern@ntin.net

Project Status

Completed
This project is "Completed". This means the project has been implemented and the report was accepted by the district leadership. The project will stay listed on this website as a testimony of the achievements of the project partners.

Project listed for the 2019-20 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Nocona (5790)

17-Jul-19

$3,000

$3,000

$6,000

Total

$3,000

$3,000

$6,000

Project Supporting Documents

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

17-Jul-19

System Entry

System Entry: Creation of project page.

21-Jul-19

by Robert Herndon

System Entry: Project is now "Fully Pledged".

21-Jul-19

by Robert Herndon

System Entry: Project reverted to "Published".

21-Jul-19

by Robert Herndon

System Entry: Project is now "Fully Pledged".

24-Jul-19

by Robert Herndon

System Entry: Project sent for club signatures.

24-Jul-19

by Robert Herndon

System Entry: Project signed by Robert Herndon.

25-Jul-19

by Dan Steele

System Entry: Project reverted to "Submitted" - Dan Steele added to the list of signatories.

25-Jul-19

by Dan Steele

System Entry: Project signed by Dan Steele.

2-Oct-19

by Dan Steele

Waiting on action by the District Grant Committee.

17-Dec-19

by Robert Herndon

12/20/2019 Progress:

Final Prelim. Plan approved by City, Phase 1 construction drawings completed

Property Survey corner pins set

Dedicated bank account established, with 2 party signature requirement

Nocona Club contribution approved and funded to dedicate account

Phase 1 construction start scheduled for January 2020

15-Jan-20

by Dan Steele

System Entry: Project approved by the District Approval Committee.

17-Mar-20

by Walter Virden

System Entry: Check for DDF payment issued by Foundation Treasurer.

2-Jun-20

by Dan Steele

System Entry: Project has been implemented and final report uploaded.

2-Jun-20

by Dan Steele

System Entry: Final report approved by the District Approval Committee.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online